Several productive weekends have gone by since I started work on Yahtzee’s new headliner. Overall, the project is taking about as many man hours as expected, and it’s turning out far better than I anticipated. I’m loving the look — especially when compared to what we had before.

Since last checking in, I’ve fully finished the starboard aft cabin and have completed about 95 percent of the main salon. By far the hardest part of working with the pine tongue-and-groove bead board is getting all the cuts close to perfect so that everything fits snug yet is able to be taken down without too much trouble. Another difficulty is in making sure to keep the edges of the boards damage free. If the tongues and grooves don’t work well, a whole board can be wasted.

Starboard aft cabin painted and fitted.
Getting everything cut and fitting perfect is a bit of trick.

One major roadblock that I’ve hit is quite literally a road between me and getting the last of the supplies that I need. Due to a change in my design while constructing the headliner, I am now missing several long sections to finish everything. And, as many people in rural Alaska are, I’m now at the mercy of Anchorage and the road connecting it to Seward. Such is life.

The Seward Highway stretches 120 gorgeous miles from Yahtzee to Anchorage. Shortly after leaving the waterfront, the two-lane road starts climbing up, winding through alpine lakes and snow-capped mountain peaks. In the wintertime, when snow has fallen, temperatures are cold and the road is slick, I’m not in a rush to spend hours driving there and back in one day, let alone two. And on a day like today, it’s not even possible because a rock slide has closed the corridor. Also, delivery is not an option.

Fortunately, the work can still go on, and there is certainly plenty left to do. The boys and I created a painting shop in a heated and insulated space underneath our cabin and we’re cranking out coated sections of the headliner daily. Given that it all needs three coats, it’s going to take a good amount of time to finish everything. Plus, I can get going on all the stained and varnished trim work that needs to get done as well.

Porter and Magnus work on painting sections of the new ceiling.

Looking ahead in our schedule, we have a planned trip to Anchorage coming in January, so the road will only stand in our way for another month. When we’re back with everything needed, this is a project that I’m excited to see in its final form.